The 1st park provides a ability of 200 MW though Sandrini II features a capability of a hundred MW. The overall price of both of those jobs weren't disclosed on the other hand, through construction, above 200 personnel were utilized. The initiatives are expected to view a handful of positions https://californiasolarcompany.movie.blog/2024/11/26/how-to-start-solar-energy-system-installation-with-a-california-solar-company/