In case the proposed subcontractor’s purchasing system has not been reviewed, the contractor shall be so suggested. (e) In case the Contractor receives the Contracting Officer’s last dedication of fabric weaknesses, the Contractor shall, in 45 days of receipt of the ultimate dedication, either right the material weaknesses or post https://cpsr85936.blog-kids.com/33935774/fascination-about-contractor-purchasing-system-review