1

High-Efficiency 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Cut

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has installed a cutting-edge 400 kW chiller, marking the timely execution of the project. This initiative demonstrates a strategic step forward in the client’s ESG agenda, enhancing operational resilience and delivering measurable decreases in both energy consumption and carbon footprint. https://e-bookmarks.com/story6413708/advanced-400-kw-chiller-installation-achieves-50k-annual-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story